Friday, January 10, 2014

Insulated

This week the insulation was blown into the walls.  On Monday Efficiency Vermont is meeting with us to make sure there are no thermal breaks and also to make sure we are still on track to earn the Energy Star rating.  Once they give our project their stamp of approval, we will be doing more electrical work (ceiling fixture rough in on first floor), installing the ducting for the ERV system and then once that is done, we can get the drywall up!
Looking through the mudroom wall into the kitchen

2nd floor master bathroom

drywall just waiting to go up on the walls!

The North elevation is completely sided. Ledger is in place for a future porch

Bulkhead is sided


West elevation nearly complete

We'll be saying good-bye to the builder after they seal our concrete floors on Monday.  They've done a great job!

 

No comments: