Monday, September 1, 2014

Roughing it

We have moved in.  We are here.  It is not pretty, but we are working on it!  We have a working half bath, and a working tub/shower.  T
Half bath sink

Half bath
Casey working to level the range.  What a mess! Temporary fridge in place so we can live here. another cabinet is to be installed above the fridge. Panels need to go on the bar - plywood is not the final detail :)



We are basically camping.  This place is still a construction zone.  Our counter tops won't be installed until the 11th, so until then, we are cooking on either the grill or a camp stove and washing dishes in the tub.  It's all good though, because we are moved in!  This is all part of this adventure.  

1 comment:

  1. What a perfect comparison! We had the same experience when we were building our current home. Imagine life without a working indoor bath, which basically means we have to set up a shower outdoors. Oh my! Hahaha! Anyway, thank you for sharing that update! I hope the work is near finishing. All the best!

    Lovella Cushman

    ReplyDelete